Sewage pump needs less maintenance, easy to operate. Please refer to the following procedures for maintenance.
Qyf14-20 Pneumatic desilting pump maintenance
Sewage pump needs less maintenance, easy to operate. Please refer to the following procedures for maintenance.
1. Every day: Check whether the pump is damaged and whether the cover plate and safety card lock are fixed.
Check whether the discharge line has been fixed firmly and not loose.
Check all hoses for damage or wear and replace if necessary.
2. Monthly: check the lubricating oil level and add it when necessary to ensure the amount of basic lubricating oil required for operation.
Check whether the discharge line has been fixed firmly and not loose.
Check all hoses for damage or wear and replace if necessary.
Qyf14-20 Pneumatic desilting pump technical parameters
Model: QYF14-20
Flow rate m /h: 14
Head M: 20
Gas consumption m /min: 5.5
Working pressure MPa: 0.55
Suction cycle: 6S
Emission cycle: 6S
Mounting dimensions (length × width × height) mm: 1830×782×890
Qyf14-20 Pneumatic desilting sewage pump physical picture